Minerals and Waste Development Plan Document - Preferred Options 1 Documents
The documents below appear in Adobe® Acrobat® (PDF) format. In order to view them you will need to have Acrobat Reader installed. (Those with visual impairments may wish to investigate Access Adobe, which provides tools and information to help make PDF files more accessible.)
All Development Plan Documents
All the Development Plan Documents and having your say.
Core Strategy Development Plan Document (Core Strategy DPD)
- Part 1 Contents and Chapters 1 - 4 (1148KB, 74 pages)
- Part 2 Figures 2 - 3 (835KB, 2 pages)
- Part 3 Chapters 5 - 7 and Appendices (707KB, 88 pages)
Site Specific Proposals Development Plan Document (SSP DPD)
- Part 1 Contents and Chapters 1- 6 (1509KB, 63pages)
- Part 2 Appendices A - F (446KB, 54 pages)
- Part 3 Appendix C links table (240KB, 11 pages) for site specific maps and profiles for sites outside the Earith - Mepal Action Area Plan area
Earith - Mepal Area Action Plan Development Plan Document (Earith and Mepal DPD)
- Part 1 Contents and Chapters 1 - 6 (1331KB, 45 pages)
- Part 2 Chapters 7 - 9, Appendices and Area Action Plan Map (1076KB, 25 pages)
- Part 3 Area Action Plan Inset Map (968KB, 1 page)
- Part 4 Appendix C links table (134KB, 2 pages) for Site Specific Maps and Profiles within the Earith - Mepal Action Plan area only
Site Assessment Methodology and Site
Profiles - Appendix C Part 1
(Appendix C of both Site Specific Proposals and Earith -
Mepal)
- Introduction and Site Assessment Methodology (203KB, 28 pages)
- Part 4 Appendix C of the Earith and Mepal Area Action Plan DPD
- Part 3 Appendix C of the Site Specific Proposals DPD
Issues & Options Maps Appendix C
Part 2
(Appendix C of both Site Specific Proposals DPD and Earith
- Mepal DPD)
- Part 4 Appendix C of the Earith and Mepal Area Action Plan DPD
- Part 3 Appendix C of the Site Specific Proposals DPD
Preferred Options Proposals Maps for SSP DPD - Appendix D
- Preferred Options Sites Maps (147KB, 3 pages)
Sustainability Appraisal Report for Core Strategy
- Contents and Chapters 1 - 8 (1115KB, 208 pages)
- Appendices 1- 6 (480KB, 116 pages)
Sustainability Appraisal Report for
Site Specific Proposals
- Contents, Chapters 1 - 8 and Appendix 5 (1017KB, 204 pages)
- Appendices 5 -
6 (846KB, 195 pages)
Sustainability Appraisal Report for Earith - Mepal Area Action Plan
- SA Report (1410KB, 283 pages)
Appropriate Assessment (Preferred Options Stage)
- Appropriate assessment (Preferred Options Stage) (625KB, 45 pages)
Further background
documents are available
Many of the above documents are available to purchase (52KB, 2
pages).
