Search powered byGoogle

Please note: Translations are handled by an external website and are not endorsed by Peterborough City Council.

A1139 Fletton parkway Junction 2-3 Widening and Footbridge scheme

In April 2006, £7.1 million was allocated Community Infrastructure Funding by the Department for Transport and the Department for Communities and Local Government, for the widening of Fletton Parkway between junction 2 and 3, and the provision of a footbridge between the Orton township and Hampton.

The A1139 Fletton Parkway experiences traffic queues and delays at peak periods between junctions 2 and 3 and also at the junction 3 roundabout. These queues and delays are expected to worsen as a result of forecast traffic growth brought about by the continued development at Hampton and the future provision of the Hampton Western Peripheral Road.

The scheme

The scheme proposal provides a third lane in both directions between junction 2 and 3 and the roundabout at junction 3 will be signalised and widened to three lanes. The provision of the footbridge will provide a vital link between the Hampton and Orton housing areas, will fit in with the proposed road realignment and it is anticipated that this will be built at the same time. Construction of the scheme is planned to start in July 2007, with the scheme completed in March 2008.

Adobe Acobat text

The document(s) below appear in Adobe® Acrobat® (PDF) format. In order to view a document you will need to have Acrobat Reader installed. (Those with visual impairments may wish to investigate Access Adobe, which provides tools and information to help make PDF files more accessible). 

Adobe Acrobat logo
  1. PDF file icon  Further Information Leaflet
      (531KB, 2 pages)

  2. PDF file icon  Poster Boards Part 1
      (1436KB, 7 pages)

  3. PDF file icon  Poster Boards Part 2
      (1027KB, 4 pages)

  4. PDF file icon  Poster Boards Part 3
      (1075KB, 3 pages)

Malborne way

The proposals for Malborne Way:

  1. PDF file icon  Malborne Way drawing 1
      (479KB, 1 pages)

  2. PDF file icon  Malborne Way drawing 2
      (511KB, 1 pages)

  3. PDF file icon  Malborne Way drawing 3
      (511KB, 1 pages)

  4. PDF file icon  Malborne Way drawing 4
      (512KB, 1 pages)

Fletton footbridge

The plans for the footbridge between the Orton Township and Hampton have now been agreed and finalised.

  1. PDF file icon  Footbridge Design
      (844KB, 1 pages)

If you should have any questions or require any further information please email us at ltp@peterborough.gov.uk.